Jinying Transformer / Markets / Tanzania
Grid in Tanzania: 11 / 33 kV HV, 400 V LV, 50 Hz.
400 V is available on this series' low-voltage winding.
Tanzania supplies low voltage at 230 V single-phase and 400 V three-phase, 50 Hz, and most distribution transformers step 11 kV or 33 kV down to 400 V. The other thing that decides the delivery schedule is import conformity: regulated goods need a PVoC certificate of conformity issued in the country of export before they ship.
| Level | Voltage in EWURA and TANESCO documents |
|---|---|
| Medium voltage (distribution) | 11 kV and 33 kV; the Grid Code defines medium voltage as above 1 kV up to 33 kV |
| Low voltage, three-phase | 400 V (T1 and T2 customers) |
| Low voltage, single-phase | 230 V |
| Frequency and tolerance | 50 Hz; EWURA standardised user voltage 230/400 V, ±10 % |
The interconnection guideline issued by EWURA lists 400 V, 11 kV and 33 kV as the distribution connection levels.
Consignments of regulated products entering Tanzania must carry a certificate of conformity (CoC) from the PVoC programme of the Tanzania Bureau of Standards (TBS). The CoC is issued before shipment, by a conformity-assessment company appointed by TBS, and it is presented at customs clearance.
The exporter applies with the final invoice, packing list, transport document and conformity documents such as type-test reports and the manufacturer’s quality-management certificate. Compliance is assessed against the Tanzanian standard (TZS) first, then East African standards, then international standards such as IEC, and only then the manufacturer’s own specification.
There are three routes: A, inspection and testing of each consignment; B, registration of a product for repeat shipments; C, licensing of a manufacturer that has a quality system, based on type testing and factory surveillance. Consignments below USD 1,000 FOB are outside the programme. On application by the importer to TBS, some categories can be exempted from the CoC, including investors’ capital goods and materials for specific Government projects. Zanzibar runs its own PVoC.
Send the rated capacity, voltage and quantity — we quote to the grid parameters in Tanzania.